wordfence
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ostudioc/public_html/wp-includes/functions.php on line 6121It is illegal to build a masonry building on agricultural lands. To solve this problem, a light, prefabricated and portable unit is desired. In this project, the employer needed to build an office-Villa house and warehouse for the farm. As a result, the design team proposed expandable and portable modular prefabricated units. These units include the kitchen unit, the development unit and the bathroom unit, and offer different combinations based on different needs and areas. In this project, a building with an area of 60 square meters has been designed with a combination of 20 prefabricated units. This building placed on a warehouse with a metal and wood structure roof and a bamboo floor. Warehouse walls are also made of straw bale for more sustainability.
Gilan, Iran
2021
2000 sqm
Saeb Kefayati
E. Nourian