wordfence
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ostudioc/public_html/wp-includes/functions.php on line 6121The aim of this project is to turn an old building into a Innovation center. Due to the Iraqi climate, the use of outdoor canopies is essential. In this project, the paths are shaded by a connecting bridge, which also forms a public stage. In the interior design, the parametric shading façade, along with the use of modern furniture and lighting, has created a different atmosphere.
Iraq
2021
Mojtaba Sabetifard | Saeb Kefayati